Newport, WA

JAS has been working on the redesign and replacement of the existing Return, Waste, and Auxiliary Activated Sludge Pumping Station No. 1 at the City’s wastewater treatment facility. The project includes the replacement of the existing intake and discharge piping manifolds, and control valves, the replacement and upgrade of the sludge pumps, and the redesign of the pipe support system. The new improvements will make the operation of the facility less complex and allow for easier maintenance of the system.